Yesterday I made a brief attempt at fixing the last leak, but I decided I was going to have to just redo that fitting and the nearby one. In the afternoon it was off to the Red Cross for apheresis. I watched Ocean's Twelve, the sequel to the remake of the 1960 film, Ocean's Eleven. Not a bad movie, but disappointing after the first one, which did a pretty good job of capturing the essence of the original even if they didn't have the "Rat Pack". I always wonder about movie remakes. If the original was great, why remake it? I know, I know...because they don't have any original ideas anymore. What will they remake next? Casablanca?

I started today by disassembling the problem fittings, which took longer than anticipated because there was some water lurking in the pipes. But I got things apart, prepped the new fittings, sweated things, and voilĂ ! It worked first try. Thanks, Jim. You're a good teacher. But my skills will probably be rusty again by the time I'm ready for working on the plumbing again, so don't go anywhere just yet.

After lunch I worked some more on roughing in the DWV system. I'd drawn out how things were supposed to go, but when you actually get to putting pipes in place, dealing with the proper slope (1/4" per foot), various obstacles like floor joists, water supply lines, and the foundation, it gets to be a lot trickier. Oh, and of course you need to start and end up at all the right points. Since I have the main sewer line out of the addition in a fixed location through the foundation wall, that end has to be exact.

I also needed to figure out how to cut the 4" DWV pipe. It was too big to fit in my chopsaw, and I'm not that accurate with a Sawzall, so I ended up building a miter box big enough to hold the 4" pipe. And then made the cuts I needed with hand saw. A lot slower than the chop saw, but it got the job done.

I got all the runs and changes figured out, but needed to make YAHDR (Yet Another Home Depot Run), which was only partly successful. They were out of 4" connectors to join two pipes together, so I'll have to make a visit someplace else to get one when I'm out tomorrow. But there are drain lines from the shower, sink and toilet now. They just need one more fitting, and gluing together, and I'll be ready for an inspection!