Saturday, September 24, 2005

Plumbing and More Pictures

Jim came and helped me with the plumbing today as planned. I felt a little guilty about asking for his help (again), but then I remembered that I spent all yesterday afternoon helping at Camron-Stanford House, a volunteer reference Jim hooked me up with. It can be very tiring, as I've blogged about before, so now I don't feel so bad about asking for Jim's help.

Jim and his wife Brigitte came after lunch, and Jim made short work of the connections to the existing plumbing that had been giving me trouble. His sweated joints may not be the most beautiful, but they held the first time we tried turning on the water. Which is a lot more than I can say for an annoyingly large percentage of the joints I've sweated.

Below are some more pictures of the progress so far.











And for good measure, here's a picture of my neighbor Cynthia's (she helped during the concrete pour) cat Fritz. He was waiting in our driveway for some attention when I went next door to take the picture from above.

Friday, September 23, 2005

Pictures, Plumbers and Pastors

I was told I wasn't posting enough pictures, so here you go. I still want to get a shot from above of the floor framing and plumbing, but this is a start. It's the addition wearing its raincoat (and more often fog and pine needle coat). It won't keep off a serious rain, but it keeps most of the water and pine needles out.

Today I worked on the plumbing some more, but I realized yesterday that sweating pipes is not my strong suit. I can do it when there's lots of room and only a few connections, but those "last connections" where things are tight and there's multiple joints to sweat give me fits. Fortunately my good friend Jim agreed to come give me a hand (again -- he helped me out back when I was remodeling the bathroom, and dielectric unions were giving me fits).

Jim is one of those interesting people who's been a number of things in his life. He doesn't have a lot of formal education, but he's very intelligent and has a lot of different experiences, so he's a jack-of-all-trades and master of many. I'm feel like I'm more of a dilettante in comparison. Jim once made his living as a plumber, and besides having taught me about the wonders of Wonder Bread, he's taught me other valuable lessons about being a plumber: shit runs down hill, and pay day is on Friday. So there you go -- now you've begun your education as a plumber, too. A lot of the rest is fairly easy, but sweating pipes well is the work of an artist. Jim is definitely an artist. Just check out his photography.

I just realized there might be some confusion about Jim. The above refers to a different Jim than Pastor Jim who helped me during the concrete pour. Though Pastor Jim has been a number of things in life, too: raisin farmer, electrical parts salesman, and pastor, that I know of. Come to think of it, I think he was singing and playing guitar when he and his wife Nancy met.

Wednesday, September 21, 2005

Hooray for MAPP gas!

The "Sweets of the Soul" concert at RLC on Sunday wiped me out. Monday was pretty much lost to resting from that. The concert was a big success. People had a lot of fun, and we raised a lot of money for Hurricane Katrina relief and rebuilding. Let's pray that they don't get clobbered by Hurricane Rita in the mean time.

Tuesday I was thinking the forecast thunderstorms (thunderstorms? in the Bay Area? mooOOoo!) might slow down work, but instead it was taking one of our cats, Rosie, to the vet that did. She had YAAOHB (Yet Another Abscess On Her Butt), basically an area swollen from infection, usually caused by getting bitten by another cat. Since she's been indoors except for a few closely supervised trips outside on harness, the only possible source of that would be our other cat, Star. But as much as they tussle sometimes (mostly stalking and chasing each other around the house), we've never seen them get that violent with each other. Hmmph.

But along the way I've finished the floor framing, installed the duct work for the furnace, and gotten some of the water supply lines roughed in. I still need to finish those, and rough in the DWV (drain, waste and vent system), then get all that inspected. Then I can put the floor down, and start building some walls!

It's been a while since I sweated copper pipes. The last time was when I remodeled the bathroom. The window was rotten and the wall was starting to go, so I redid the whole thing, including replacing the galvanized plumbing with copper. I was almost driven mad by trying to solder di-electric unions (the special parts that connect galvanized pipes with copper), until my friend Jim told me to get some MAPP gas. It makes a lot hotter flame than a regular propane torch, and makes things a lot easier. But my skills were a bit rusty, so I practiced before sweating any joints that matter. We'll see how well I did when I actually pressure test things, but the MAPP gas made things go pretty smoothly.

Wednesday, September 14, 2005

Yo Vivo En Home Depot

Monday I worked with Edis and we installed some joists and cleaned up the old stairwell that will be beneath the entry and dining room. It was nice to have him for the clean up (lots of hauling), but I'm not sure it was a net gain hanging joists with him.

Tuesday I worked alone, and spent much of the day picking up some double-wide joist hangers and then getting plumbing supplies at Home Depot. Net result, not that much done on the house itself.

Today I worked alone again, and got a lot done. All the joists hung in the entry and dining room area, a couple more in the bedroom, and I got a good start on the framing where the stairs and pocket door to the bedroom will go. But I needed to make another Home Depot run in the middle. Doh! But all in all, a very productive day.

Right now I'm at Resurrection for the worship team practice. I don't usually make it to practice because it's a bit of drive here and back, but this weekend we're putting on a song fest, "Sweets of the Soul". A mix of secular and Christian music, good times, and a key component -- desserts! There's a free will offering that will go to Hurricane Katrina relief. Probably Habitat for Humanity and their "Operation Home Delivery", which will have affiliates around the country pre-framing houses and shipping them in containers down to New Orleans and Mississippi.

Friday, September 09, 2005

Pictures

I've added some pictures to previous entries, including some my neighbor Cynthia took during the concrete pour, and yesterday's entry about floor joists.

Today I worked alone, and started a bit later (well, OK, a lot later) than I do when I'm working with Edis or Naun. I installed the ledger board to hold one end of the floor joists, which involved putting in a lot of big self-tapping screws into the Simpson ICF ledger connectors. I also installed the rim board around the bedroom and bathroom level, and actually got 3 floor joists put up. I stopped there in part because to put in any more, I need to move the pile of joists I'm storing in the middle of the foundation, lest they get trapped. But it's looking more and more like a house!

And because Kat had never seen the loads I've carried on the VW Golf (and hinted at she probably didn't want to see), here's a picture of some 16' and 20' 2x10s that I brought home yesterday after dropping off Edis. I got them because a bad bit of planning. The ICF ledger connectors are for 2x material (1-1/2" actual thickness), but the rim board is only 1-1/4". So I needed to use regular lumber for them, though it's better to use manufactured rim boards when using manufactured joists, as regular lumber shrinks more than manufactured does, so it can lead to mismatches if you're not careful. So now I have too much rim board. I'm not sure if I can take it back or not, since it's a special order item.